After a fall, the story can shift fast. In the Cambridge area, it’s common for job sites to be reconfigured between shifts—decking is replaced, sections are taken down, and safety reviews are documented in ways that may not fully capture what happened in the moment.
That timing matters because claims are built on proof: what condition existed, who controlled the work, what safety measures were required, and how those requirements were not met.
If you wait too long, you may lose:
- photos from the first day
- incident reports or supervisor notes
- access logs, inspection checklists, or training documentation
- witness availability (including subcontractor workers who move to the next site)


